To Top

Making More Progress on the Racer

• CATEGORIES: Builds, Features • TAGS: This site contains affiliate links for which I may be compensated.

Sorry the pics aren’t better, but the focus is on creation and not documentation. The goal is to be able to drive it during the first week of May.

The clutch and brake pedal system are all ready for install, though it’s apart for paint. The floor framework is partly complete as of today. I should have the floor frame and floor itself ready for some paint by Sunday (assuming there aren’t more distractions (there have been plenty of those ..).

I ended up building a custom bracket system for the clutch and brake. Because of the holes in the firewall from the old clutch/brake system, I sandwiched the firewall between the bracket I made and a thin sheet of metal to make it look cleaner. Here’s a very rough look from a few days ago. Both pedals had bends, which I straightened (and are straighter than shown below) with the press (as I didn’t need the bends).

2023-04-12-clutch-brake2 2023-04-12-clutch-brake1

Below are some of the parts with a layer of paint. There’s nothing fancy here. I’d love to have the time to tear the whole jeep down, properly clean it, then paint it. But, I want to run the racer first to see how it does before investing more time doing a big overhaul.

2023-04-12-painted-parts1

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Subscribe without commenting